Bridge Inn Road Watermain, Mernda +
Project Value: $200,000
Project Summary: New meter assembly’s & watermain connection to facilitate 625 Bridge Inn Road Development supply.
Project Scope:
- Road boring & new main installation
- Meter Box & fittings assembly
- Testing & Commissioning of new main supply
-
Valley Pack Cold Storage Stage 1 Mooroopna +
Project Value: $500,000
Project Summary: Construction of new container & trucking hardstand to support the expansion of Valley Pack Cold Storage & Logistics
Project Scope:
- Stripping – 8,000m2
- Bulk Earthworks – 4,000m3
- Drainage – 300 lm
- Crushed Rock Pads 3,000 tonnes
- Concrete Works – 800m2
-
Apex Drive Industrial, Truganina +
Project Value: $350,000
Project Summary: Bulk earthworks, footing excavation, and crushed rock pad placement to support the construction of warehouses at 47a Apex Drive, Truganina
Project Scope:
- Stripping – 6,800m2
- Bulk earthworks, including cart & disposal of material – 2,700m3
- Crushed rock pads – 2,400 tonnes
- Detailed excavations – 600l/m warehouse footings
-
Axiom Estate Stage 7, Truganina +
Project Value: $3,200,000
Project Summary: Construction of a new industrial subdivision.
Project Scope:
- Stripping – 7.2000m2
- Bulk & detailed earthworks – 4300m3
- Material cartage & disposal – 1,900m3
- Stormwater Drainage – 420m
- Ecocepter Stormwater Treatment Unit Installation
- Sewer mains – 380m
- Water & fire mains – 220m
- Gas mains – 220m
- Water & fire meter assemblies
- Bored road crossings – 3no.
- Crushed Rock Road Pavements – 4,100 tonnes
- Kerb & Channel – 450lm
- Concrete Road & Footpath – 3,100m2
- Authority Electrical Mains & Kiosk
- Private Electrical, Public Lighting & NBN
-
Robinsons Road Vic Roads Slip Lane, Truganina +
Project Value: $700,000
Project Summary: Construction of new Vic Roads slip lane to provide access to Axiom Estate Stage 7 via Robinsons Road.
Project Scope:
- Traffic Management of signalled intersection
- Night works from barrier installation and removal
- Non-destructive digging and existing service proving
- Authority over head power pole relocation works
- Stripping
- Bulk Cut & Fill
- Remove and dispose existing kerb & channel
- Stormwater Drainage
- Asphalt road pavement construction – 1,400m2
- Kerb and channel – 300lm
- Foot & cycle path – 600m2
- Guardrail & Terminal End Treatments – 250lm
-
Redgum Estate, Mernda +
Project Value: $2,600,000
Project Summary: Construction of a new 30-lot subdivision & Melbourne Water outfall drain.
Project Scope:
- Non-destructive digging and existing service proving
- Stripping – 5,500m2
- Bulk Earthworks – 4,000m3
- Sewer – 340lm
- Council Stormwater Drainage – 350lm
- Melbourne Water Stormwater Drainage – 190lm
- Creek Connection Outfall Rock beaching
- Watermain – 150lm
- Gas – 150lm
- Road pavement construction – 2,400 tonnes
- Asphalt Pavement – 1,420m2
- Kerb & channel – 370lm
- Concrete footpath & driveway – 840m2
- Electrical, public lighting & comms reticulation
-
6A Butler Court, Wallan +
Project Value: $3,000,000
Project Summary: Construction of a new 41-lot subdivision, retention basin and wetlands.
Project Scope:
- Stripping – 9,600m2
- Bulk Earthworks – 8,500m3
- Stormwater retention basin with rock lining and jute matting – 4,500m2
- Sewer – 430lm
- Stormwater Drainage – 890lm
- Swale Drain – 560lm
- Watermain – 690lm
- Gas – 690lm
- Road pavement construction – 5,800m2
- Kerb & channel – 1,420lm
- Concrete laneways, footpath, cycle path & driveway – 6,500m2
- VicRoads Noise Barrier – 320lm
- Electrical, public lighting & comms reticulation
-
Valley Pack Cold Storage Stage 2, Mooroopna +
Project Value: $600,000
Project Summary: Prepare building pad area to enable construction of a new cold storage warehouse and construct new hardstand for expansion of Valley Pack Cold Storage & Logistics.
Project Scope:
- Stripping – 10,800m2
- Bulk Earthworks including cart & disposal
- Crushed Rock Pad – 4,200 tonnes
- Swale drain excavation – 240lm
- Regrading of existing truck turnaround area